Flash butt welding of the rim butt seam: the two ends of a rolled steel strip are flashed, then upset hydraulically into one full-section joint. Hydraulic clamping, servo upsetting and water-cooled electrodes keep the seam repeatable through long production runs.

The figures a rim line is planned around: section capacity, forces, rim range and services.
| Rated welding power | 1,000 kVA |
| Weld cross-section | 1,000–3,200 mm² |
| Weld seam width | up to 400 mm |
| Rim diameter range | 17.5–24 inch |
| Welding speed | 5–30 mm/s, stepless |
| Hydraulic pressure | 3–15 MPa |
| Rated clamping force | 800 kN |
| Rated upsetting force | 400 kN |
| Jaw adjustment range | 100 mm |
| Transformer taps | 6 |
| Secondary voltage | 6–13 V |
| Cooling water pressure | 0.2 MPa |
| Oil pump motor | 22 kW |
| Duty cycle | 60% |
| Cycle time | a 22.5 inch rim in 15 s or less, excluding handling |
| Scrap rate | ≤0.05% on rim steel |
| Machine weight | approx. 15 t |
* Specifications as supplied for this model. Final configuration confirmed on the proforma invoice.
The welding head, the hydraulics and the optional welding-flip station are described separately because they are quoted as one rim line.
Horizontal frame, four cast-steel clamp arms
| Frame | Horizontal, welded and stress-relieved, four cast-steel clamp arms |
| Clamping | Hydraulic, PLC controlled, left and right clamping independently adjustable with pressure gauges |
| Upsetting | Servo driven upsetting screw with 100 mm jaw adjustment |
| Guidance | Moving platen runs on linear guideways |
| Transformer | Built-in temperature monitoring, 6 voltage taps |
| Welding modes | Pulsating and non-pulsating flash programmes |
| Electrodes | Two chrome-copper electrode blocks, 400 mm, mounted on the body |
| Current path | Enclosed rotary shunt, visible and serviceable |
| Cooling | Water-cooled secondary and electrodes |
One pump station, one control cabinet
| Hydraulic pressure | 3–15 MPa, set by relief valve |
| Pump motor | 22 kW |
| Control | PLC with touch screen; welding programme, clamp, upset and release in one cycle |
| Cooling water | 0.2 MPa, filtered |
| Duty cycle | 60% at rated power |
| Alarms | Water flow, hydraulic pressure, programme fault |
For the circumferential seam, quoted separately
| Workpiece diameter | 400–600 mm |
| Workpiece height | 200–300 mm |
| Flip | Pneumatic, 60° |
| Rotation | Servo motor with reducer |
| Conduction | Four copper posts |
| Torch height range | 200–700 mm |
One PLC for the whole line
| Controller | PLC with touch screen and program storage per rim size |
| Interlocks | Clamp before flash, water before current, guard closed before upset |
| Indication | Audible and visual alarm, fault text on screen |
| Recipes | Weld programme, clamp pressure and upset distance saved per rim size |
Why a rim plant welds the seam this way rather than with a seam welder.
Flash butt welding joins the whole cross-section of the strip end. There is no filler wire and no weld cap to dress, and the joint is as strong as the parent metal.
The clamp holds the two ends square while the servo upset pushes them together. Force and distance are programmed, so the joint does not depend on the operator.
Electrodes and secondary are water cooled, so the machine holds its duty cycle through three shifts instead of drifting as the head heats up.
The jaws adjust over 100 mm and the transformer has six taps, which covers the 17.5 to 24 inch range without a mechanical rebuild.
With a controlled flash and upset programme the scrap rate stays at or below 0.05% on rim steel, which is what makes the station economical in high-volume rim plants.
Where this seam welder is used.
Services and space the rim plant provides.
| Power supply | AC 380 V, 3 phase, four wire |
| Distribution transformer | ≥1,000 kVA recommended |
| Cooling water | 0.2 MPa, filtered, returning to a tank |
| Compressed air | 0.6 MPa for the pneumatic flip station |
| Floor | Level foundation, machine weight approx. 15 t |
| Working height | Rim loading height as per layout drawing |
What rim plant engineers ask before ordering.
17.5 to 24 inch. The jaw adjustment gives 100 mm of movement and the six transformer taps cover the section change from small to large rims.
A 22.5 inch rim welds in 15 seconds or less, excluding loading and unloading. Handling time depends on the loader in front of the machine.
Yes. Flash butt welding joins the full cross-section with no filler metal, and the upset removes the cast structure from the joint face.
The flash butt welder does the butt seam. The circumferential seam is done on the optional welding-flip station, which rotates the rim under an arc torch.
The stations that complete a rim line.

Rolls the welded blank into the finished rim profile.

Expands the rim to final diameter and corrects roundness.

Spins the disc that is then welded into the rim.
Give us the rim diameter, strip thickness and section width and we will confirm the clamp jaws, transformer taps and cycle time.