A 15-metre through-line that brazes the return bends of air conditioner and refrigeration coils. Workpieces ride a VFD conveyor from the 5 m pre-brazing section through a 2 m flame station to an 8 m post-brazing run — no manual loading at the burner. The flame comes from mixed LPG and oxygen, the copper tube bore is protected by nitrogen, flux is carried in by the gas, and compressed-air nozzles cool the fins so they are not burnt through. One operator sets the recipe on a colour touch screen and the line repeats it.

The line layout and gas figures decide whether this machine drops into your coil shop. Tell us your coil size, return-bend diameter and takt time — we confirm the conveyor length, station count and gas panel configuration on the proforma invoice.
| Total line length | 15 m — 5 m pre-brazing, 2 m brazing, 8 m post-brazing |
| Workpiece envelope (brazing section) | L ≤ 2 m · W ≤ 2.2 m · H ≤ 4.5 m |
| Conveyor speed | 0–4.5 m/min, frequency-converter adjustable |
| Speed setting | Set and displayed on the touch screen in m/min |
| Main chain | Standard roller chain |
| Chain plate | 3 mm stainless steel with 10 mm rubber surface |
| Flame control | Intelligent gas control system stabilises gas flow and flame |
| Recipes | Colour touch screen; ≥ 10 sets of welding parameters stored |
| Fuel gases | Liquefied petroleum gas + oxygen, mixed before the burner |
| Internal protection | Nitrogen purge through the copper tube bore, 0.01–0.10 MPa, timing adjustable |
| Cooling | Compressed-air nozzles on both sides of the weld zone; water-cooled fire row |
| Electrical control | Mitsubishi PLC + Mitsubishi touch screen, Schneider switchgear, Omron relays |
| Pneumatics | SMC air-source triple unit and pneumatic valves |
* Specifications as supplied for this model. Final configuration confirmed on the proforma invoice.
The full parameter set the line is built to — conveyor, station geometry, gas pressures, controls and safety hardware. The same sheet goes to your plant engineer before the purchase order.
Three sections on one roller chain, 15 m total
| Total length | 15 m |
| Pre-brazing section | 5 m |
| Brazing section | 2 m |
| Post-brazing section | 8 m |
| Speed range | 0–4.5 m/min, VFD |
| Speed display | Touch screen, m/min |
| Main chain | Standard roller chain |
| Chain plate | 3 mm stainless steel + 10 mm rubber |
| Drive | Drive motor and reducer, traction chain |
LPG + oxygen, mixed and stabilised before the burner
| Fuel gas | Liquefied petroleum gas, 0.08–0.12 MPa at point of use |
| Oxygen | 0.3–0.9 MPa at point of use |
| Mixing | Proportional mixer ahead of the combustion head |
| Flame stability | Intelligent gas control system holds flow and flame steady |
| Fire row | Tip holder + tip assembly + adjustable guide rod |
| Tip level after heating | Each tip < 1 mm deviation in the horizontal assembly |
| Row motion | Self-swinging fire row, lift and lower mechanism, manual height adjustment for two part heights |
Nitrogen inside the tube, flux in the flame, air outside the fins
| Nitrogen protection | Separate pressure regulator, 0.01–0.10 MPa, adjustable fill time |
| Flux feed | Flux carried by the gas into the joint; automatic nitrogen purge after brazing clears the passage |
| Fin protection | Compressed-air nozzles both sides of the weld zone; burn-off target < 6 pieces per workpiece |
| Fire-row cooling | Water jacket on the fire row with circulating tank and pump |
| Water-flow interlock | Flow switch on the cooling circuit; gas is cut off if circulation stops |
| Post-brazing cooling | Compressed air on the workpiece |
Mitsubishi PLC, colour touch screen, Schneider switchgear
| PLC | Mitsubishi (Japan) |
| HMI | Mitsubishi colour touch screen |
| Contactor | Schneider |
| Air switch / leakage protection | Schneider |
| Intermediate relay | Omron |
| Push buttons & indicators | Schneider |
| Recipe memory | ≥ 10 parameter sets, callable by number |
| Control box | Separated from the machine body, all switches on the control board, cooling fan fitted |
SMC air-source unit, manual valves for each gas line
| Air-source triple unit | SMC — filter, regulator, lubricator |
| Pneumatic valve | SMC |
| Manual valves | Domestic supply |
| Gas panel | Dedicated pipeline control cabinet between the buyer's source and the machine |
Flashback arrestors, forced exhaust, heat shield
| Flashback protection | Tempering valves on the LPG and oxygen lines, inside and outside the gas cabinet |
| Exhaust | Exhaust fan in the pipeline cabinet prevents combustible gas accumulation |
| Heat shield | Protective cover over the brazing zone with an exhaust opening at the top |
| Warning window | High-temperature warning marking; monitor window in heat-resistant organic glass |
| Smoke extraction | Smoke exhaust port on the machine; ducting by the buyer |
| Water-cut protection | Combustion gas shut off automatically when water is low or the cooling line is blocked |
The line as installed — pre-brazing conveyor, brazing cabin with the fire row, gas control cabinet and the post-brazing run.



Five decisions this line makes for you, in the order they show up on the shop floor.
5 m pre-brazing, 2 m brazing and 8 m post-brazing on a single roller-chain conveyor. Loading and unloading happen away from the flame, so one operator can run the line and inspect at the same time.
0–4.5 m/min through a frequency converter, entered and read in m/min on the touch screen. Change coil size and you change the number, not the hardware.
The intelligent gas control system holds LPG and oxygen flow steady, so flame length does not drift across a shift — the usual cause of overheated or under-brazed return bends.
Nitrogen protects the copper bore, flux carried by the gas cleans the joint, compressed-air nozzles keep the aluminium fins off the burn line, and the water-cooled fire row plus flow interlock protect the tooling.
At least ten parameter sets stored in the colour HMI: gas pressures, conveyor speed, flame timing. Call up a coil model, run it, and the next shift repeats the same result.
Built for coil production where the return-bend joint has to be leak-free at every station — room air conditioners, refrigerators, condensing units and compressor lines.
Gas sources, water and ducting are supplied by the buyer; the flame panel and the wear parts come with the machine.
| Liquefied petroleum gas | 0.08–0.12 MPa at point of use |
| Oxygen | 0.3–0.9 MPa at point of use |
| Low-pressure nitrogen | 0.4–0.6 MPa at point of use |
| Low-pressure compressed air | 0.50–0.55 MPa at point of use |
| Cooling water | 0.4–0.6 MPa at point of use |
| Electrical supply | 380 V · 3 phase · 50 Hz (confirm on the proforma invoice) |
| Smoke exhaust duct | By the buyer, from the machine's exhaust port |
| Foundation / floor | Level floor along the 15 m line, clear of the 2 m brazing cabin envelope |
The five points coil shops raise before signing — answered with the line data, not a brochure.
It brazes the connection between the long U tube and the small U tube of a heat exchanger — the return bends on fin-and-tube coils. The workpiece is conveyed into the brazing zone, the fire row swings across the joint, and the part leaves on the same chain.
Nitrogen is fed into the copper tube bore at 0.01–0.10 MPa with an adjustable fill time, and the joint is brazed with flux carried in by the gas. After brazing, nitrogen purges the passage so residual flux cannot block it.
Compressed-air nozzles on both sides of the weld zone cool the fins, the fire row itself is water-cooled, and the flame is set by recipe. The design target is fewer than six burnt pieces per workpiece, checked at commissioning.
LPG 0.08–0.12 MPa, oxygen 0.3–0.9 MPa, low-pressure nitrogen 0.4–0.6 MPa, compressed air 0.50–0.55 MPa and cooling water 0.4–0.6 MPa at the points of use. Anything outside these ranges needs a regulator added at installation.
Yes. At least ten parameter sets are stored in the colour touch screen; conveyor speed is entered in m/min and the gas panel holds the matching flame settings. Changing model is a recipe call, not a mechanical changeover.
Flashback arrestors sit on the LPG and oxygen lines inside and outside the gas cabinet, an exhaust fan keeps the cabinet free of combustible gas, the brazing zone has a heat shield with a top vent, and the cooling-water flow switch cuts the gas if circulation stops.
Most brazing lines ship with one of these — same engineering contact, one container.

Flash butt welding of copper to aluminium tube at φ6.0–9.52 mm — the joint upstream of the return-bend braze.

Rotary brazing station for copper manifolds and distributor assemblies.

On-site hydrogen-oxygen flame unit for small copper joints and repair work.
Coil size, return-bend diameter, gas availability and pieces per shift. An English-speaking engineer replies within one business day with a line layout and gas schedule.